Independent valuation reports and expert evidence for arbitration, civil suits and NCLT matters, covering land, buildings and construction claims. We explain the method in plain terms and stand by the report.
In an arbitration or court case, a valuer gives an independent opinion of value, or of the cost of work done, on a stated date. The report may be filed by one party, or the tribunal can appoint its own expert under Section 26 of the Arbitration and Conciliation Act, 1996.
The method matters as much as the number. A tribunal weighs how the value was reached: the evidence used, the assumptions made and whether the valuer had any stake in the outcome.
Construction disputes often need both: the value of the property and an engineer’s measurement of the work actually done. Our team covers both.
Value of land, buildings or work in contract disputes.
Measured value of work done, extra work and defects.
Asset values in insolvency and company disputes.
A fair basis for dividing family property.
Market value evidence when compensation is challenged.
Fair rent or value on a disputed date.
The question to be answered and the valuation date, agreed in writing.
Pleadings, contracts, drawings and records read.
Property or works inspected and measured.
Comparable sales, rates and measurements documented.
Value or cost on the stated date, with assumptions set out.
Method, evidence and a statement of independence.
Scope first, then evidence, then a report that stands up.
Question, valuation date and documents agreed.
Records, contracts and drawings checked.
Property or works inspected and measured.
Report issued, and explained to the tribunal if needed.
We share a written proposal with scope, fee and timeline.
IOV RVF member (Land & Building)
Property value and construction work assessed by one team.
No stake in the outcome, stated in every report.
Methods explained in terms a tribunal can follow.
Yes. Under Section 26 of the Arbitration and Conciliation Act, 1996, unless the parties agree otherwise, the tribunal can appoint an expert to report on specific issues, and the expert can be asked to attend a hearing.
Yes. A party can file an expert valuation report as evidence, and the other side can challenge it.
The date the dispute requires, such as the date of breach, termination or the claim. We state it clearly in the report.
Yes. Our engineers measure the work done and value it at contract rates or market rates, as the case needs.
Yes, wherever access is possible. A site visit is the basis of any reliable value.
Share the property, the dispute and any deadline and we’ll reply within 4 working hours with the fee and next steps.
Design, engineering, contracting and property valuation under one roof. Leave your number and a principal will call you back.
A principal replies within 4 working hours. No spam, ever.